The purpose of the individual system analysis and design project is to demonstra

Do you need this or any other assignment done for you from scratch?
We have qualified writers to help you.
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)

NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.

NB: All your data is kept safe from the public.

Click Here To Order Now!

The purpose of the individual system analysis and design project is to demonstra

The purpose of the individual system analysis and design project is to demonstrate student’s ability to apply the knowledge learned in this course to a real-world project.
Project Deliverables
The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan.
Title page (project name, author, and date)
Phase 1: Requirement analysis
A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Descriiption of the proposed system
G. Logical model design
1. Data flow diagrams
• Context diagram
• Diagram 0
o Diagram 1 (Diagram 1 is optional)
• Descriiptions of processes in each diagram
2. Descriiptions of outputs/inputs/performance/security or controls
H. Specific requirements, if any (interface, operational, resource, performance, etc.)
Phase 2: System and database design
A. User interface
Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.
1. How data will be input to the system?
• The physical layout for each input
• The input design and procedures
2. How data will be output from the system?
• The physical layout for each output
• The output design and procedures

B. Data design
Develop a plan for data organization, storage, updating, and retrieval.
1. Database design
• Database tables with their attributes should be presented
• Primary key(s) should be identified in each table, if any
• Three steps of normalization should be included.
2. Entity-relationship diagrams
3. Data file storage and access
C. System architecture
Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.
Phase 3: Project plan
A list of tasks or activities needed for implementing the proposed system
Estimating completion time and costs
A project schedule for performing those activities (Gantt charts or PERT charts)

Do you need this or any other assignment done for you from scratch?
We have qualified writers to help you.
We assure you a quality paper that is 100% free from plagiarism and AI.
You can choose either format of your choice ( Apa, Mla, Havard, Chicago, or any other)

NB: We do not resell your papers. Upon ordering, we do an original paper exclusively for you.

NB: All your data is kept safe from the public.

Click Here To Order Now!

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount