Read Carefully!!!! You are required to prepare a construction estimate and sched

Read Carefully!!!!
You are required to prepare a construction estimate and sched

Read Carefully!!!!
You are required to prepare a construction estimate and schedule for the work indicated on the
attached plans.
DELIVERABLES
1. Title Sheet
2. Table of Contents
3. A brief written narrative summarizing your approach for both the estimate and schedule.
Your summary should state a summary of the estimate and a summary of the schedule
including duration, ending date, and critical path. (approximately 1,500 words)
4. The Construction cost estimate should be in a similar format to the sample provided.
5. A linear schedule using Microsoft Project or similar program (you can also use Excel if
you do not have access to Project).
a. Identify all nine major tasks, notice to proceed and setting up construction
trailer.
b. Identify the overall project duration
c. Critical Path
d. Identify any overlap or float in the schedule.
Your submission shall be bound into a single PDF and start the title of your submission with your last
name.
please follow the requirement. thank you.

I have the following attached task to completed. I have already completed it, ho

I have the following attached task to completed. I have already completed it, ho

I have the following attached task to completed. I have already completed it, however I need someone to correct, edit and make it better .I attached my solution as well

i will attach the requirments.The dry weight of the soil + tin is 35.12 grams. T

i will attach the requirments.The dry weight of the soil + tin is 35.12 grams.
T

i will attach the requirments.The dry weight of the soil + tin is 35.12 grams.
There is also a mistake in the report requirements. The “Experimental Procedure” should be the “Objective” of this lab for 0.75 points.

The floor plan needs to be fixed the exitior skin Victor :) The site needs to fi

The floor plan needs to be fixed the exitior skin
Victor 🙂
The site needs to fi

The floor plan needs to be fixed the exitior skin
Victor 🙂
The site needs to fix
Victor 🙂
Section
Victor 🙂
Elevation need to fix
Victor 🙂
I find a did everything but they just need to be fixed and look better

The floor plan needs to be fixed the exterior skin The site needs to fix Section

The floor plan needs to be fixed the exterior skin
The site needs to fix
Section

The floor plan needs to be fixed the exterior skin
The site needs to fix
Section
Elevation needs to fix
I find I did everything but they just need to be fixed and look better
I also need the bridge from Chicago river downtown , The bridge included

Follow the instructions in the PDFS and I need Read carefully Recap Project Del

Follow the instructions in the PDFS and I need Read carefully
Recap Project Del

Follow the instructions in the PDFS and I need Read carefully
Recap Project Deliverables:
Establish the Project Objective, Project Name & Project Team (Highest & Best Use given Industrial)
Provide Preliminary Site & Building Concept Plan
Existing conditions
Site Plan with Elements
Building Site Layout
Stormwater Management
Provide Schedule & Estimated Project Cost
Submit Request for Qualifications (RFQ) and Request for Proposal (RFP)